17 priority projects worth PhP1.2 billion has been lined up this year by Department of Transportation (DOTr) in its Proposed Engineering Projects 2018.

These projects include the following: PhP256 million widening of the T-Pier with Roll-on, Roll-off (RORO) ramp with complete solar lighting facilities; PhP461 million widening of Marginal Wharf complete with street lights; and, PhP80 million construction of RORO ramp at the Container Freight Station (CFS) area.

Other PPA projects, which were evaluated, included the Construction of T-Head Pier and Backup Area (Paniran Area) worth PhP90.2 million, PNA reported.

Zamboanga
P1.2 billion Awaits Zamboanga City Port This Year
January 25th 2018 10 am
Zamboanga City

17 priority projects worth PhP1.2 billion has been lined up this year by Department of Transportation (DOTr) in its Proposed Engineering Projects 2018.

These projects include the following: PhP256 million widening of the T-Pier with Roll-on, Roll-off (RORO) ramp with complete solar lighting facilities; PhP461 million widening of Marginal Wharf complete with street lights; and, PhP80 million construction of RORO ramp at the Container Freight Station (CFS) area.

Other PPA projects, which were evaluated, included the Construction of T-Head Pier and Backup Area (Paniran Area) worth PhP90.2 million, PNA reported.

Be Our Sponsor
You can support Mindanao Economic Boom and our cause to spread awareness about Mindanao's incredible tourism potential and economic opportunities!
09973264950
Other Ways To Send Your Support? Learn More